Survey Plan Production
Registered survey plan production in Edo State, Nigeria: plans approved by the Surveyor General, ready for C of O, building approval and Governor's Consent.
Field service run from our Benin City, Edo State headquarters. Projects outside Edo State are mobilised on request, with the same licensed professionals and reporting standard.
What We Do
A registered survey plan is the foundation of every land transaction in Edo State: you need it for a C of O, for Governor’s Consent, and as the first document in any building approval application. We produce survey plans through licensed SURCON surveyors, with coordinates that match EDOGIS records, and register them with the Surveyor General’s office.
What a Registered Survey Plan Includes
- Accurate boundary measurement: beacons placed and verified on the ground
- EDOGIS-compatible coordinates: your plan matches the state’s land records, so it clears the Ministry’s checks
- Surveyor General registration: the stamp that makes your plan valid for C of O and approval applications
- Beacon report: a written record of where your boundary pillars sit
The Process
- Site visit and measurement: our surveyor visits the land, takes readings and confirms boundaries with neighbours where needed
- Draft plan preparation: the plan is drawn and checked against EDOGIS records
- Registration: the plan is lodged with the Surveyor General’s office for approval
- Delivery: you receive your registered plan as digital files (PDF/DWG) and printed copies, couriered if you’re abroad
How Survey Plans Support Your Other Work
Your survey plan is the common thread across everything else you’ll do with your land:
- Certificate of Occupancy Facilitation: a C of O application is built on your registered survey plan
- Building Permit Processing: the first document the Ministry asks for
- Governor’s Consent Facilitation: required for the transfer of your title
- Cadastral Search: verify the land is not already registered to someone else before you survey
FAQs
See the common questions above, or read our free guides on how to verify land title in Nigeria and land documents every buyer needs.
Ready to get started? Book a free consultation. We respond within 2 working hours.
Frequently Asked Questions
How long does survey plan production take in Edo State?
Typically 1 to 2 weeks for a standard plot once the land is physically accessible and the title documents are in order. Complex or disputed sites take longer because the surveyor must resolve boundaries first.
Why does the Ministry reject survey plans?
Most rejections come from unregistered surveyors, coordinates that do not match EDOGIS records, or beacons not properly placed. We only file plans prepared by licensed SURCON surveyors, so your plan passes the first checkpoint.
Do I need a survey plan before building approval?
Yes. A registered survey plan is the first document the Ministry of Physical Planning asks for in any building approval application in Edo State. Without it the file is automatically rejected.
Can I get a survey plan from abroad?
Yes. We coordinate the field survey with your local caretaker or family representative on site, then courier the registered plan to you anywhere in the world.